Project 1100 Sportster Phase Three

May 16, 2015 1 min read

In this segment we cleaned, inspected and repaired the wire harness. Reinstalled the wire harness and battery.  Tested the electrical system, lights, horn, ignition, etc. All new oil lines have been installed so we will have no oil leak problems in the future. The aluminum mag wheels have been painted and detailed. I have sanded the rim lips and spoke for contrast like the engine. The rear suspension is reinstalled and wheels are on....


Leave a comment

Comments will be approved before showing up.