Winding down to the end of the 69 project. Just installed a set of Ridler 20" wheels with Toyo Proxes tires.
Next I will be installing a wood bed floor from the Bruce Horkey company. That is on order and should be here by 4-18. That will be the crowning touch on a long project.
Can't wait to drive this thing and get it dialed in.