Project 68 Camaro Floor Repair, Firewall, Sub-Frame & Suspension Components


Next phase of the project after disassembly is the repair of rusted areas of the floor. Sand blasting frame and suspension components. Cutting out rusted areas. Fabricating and welding patches in the floor area.

Next will be the refinishing Process and some re-assembly.

The re



Leave a comment

Comments will be approved before showing up.


Also in Projects

67 Dodge Charger "Back N' Black" Full Restomod    It's done!
67 Dodge Charger "Back N' Black" Full Restomod It's done!

67 Dodge Charger Project Rotisserie Restoration by Troy Kane @ Vtwinstov8s.com. Features Mopar Wedge Power with Holley Sniper Fuel Injection. Torqueflite transmission with a Gearvendors Overdrive. Mopar 8 3/4 Suregrip Rearend with 3.54 gears. Suspension is by Control Freak up front and Riley Motorsports in the rear. Features Viking coil over shocks all around. Wilwood Disc brakes up front and MBC discs in the rear. Rack & pinion steering. Sway Bar up front.

Read More

67 Charger Protouring as featured in Hotrod Magazine
67 Charger Protouring as featured in Hotrod Magazine

Read More

64 Imperial Project Stripped
64 Imperial Project Stripped

Read More