Project 68 Camaro, Sub frame removal, Floor Repair, Firewall repair


Started this 68 Camaro. The plan is as follows: Remove the nose and sub-frame. Repair a rusted floor pan (fun). Repair/refinish the firewall. Repair/rebuild the front clip (sub-frame, suspension, steering etc.)

Then re-assemble including the engine/transmission. Put the nose back on and essentially make the car a driver. Attached are photos of the start of the project. I will be posting regular updates.

Got a question? Just ask I am here to help.



Leave a comment

Comments will be approved before showing up.


Also in Projects

67 Dodge Charger "Back N' Black" Full Restomod    It's done!
67 Dodge Charger "Back N' Black" Full Restomod It's done!

67 Dodge Charger Project Rotisserie Restoration by Troy Kane @ Vtwinstov8s.com. Features Mopar Wedge Power with Holley Sniper Fuel Injection. Torqueflite transmission with a Gearvendors Overdrive. Mopar 8 3/4 Suregrip Rearend with 3.54 gears. Suspension is by Control Freak up front and Riley Motorsports in the rear. Features Viking coil over shocks all around. Wilwood Disc brakes up front and MBC discs in the rear. Rack & pinion steering. Sway Bar up front.

Read More

67 Charger Protouring as featured in Hotrod Magazine
67 Charger Protouring as featured in Hotrod Magazine

Read More

64 Imperial Project Stripped
64 Imperial Project Stripped

Read More